References

Ships and projects I contributed to:

RoPax & Ferries

  • Design of RoPax ferries by OSK to be build
  • Design of “The new TT-Line Green Ship” by OSK to be built by Jiangsu Jingling shipyard
  • Design of RoPax for state-owned Algerian operator ENTMV by OSK to be built by GSI
  • VISBORG owned/operated by Rederiaktiebolaget Gotland, designed by OSK being, built by GSI in 2018
  • BERLIN & COPENHAGEN owned/operated by Scandlines built in 2015/2016
  • LOCH SEAFORTH owned/operated by Caledonian Maritime Assets Ltd built by FSG in 2014
  • NORTHERN EXPEDITION owned/operated by BC Ferries built by FSG in 2009
  • COASTAL RENAISSANCE  & sister vessels owned/operated by BC Ferries built by FSG in 2007/2008

RoRo

  • SEAROAD MERSEY II owned/operated by SeaRoad Shipping build by FSG in 2016
  • OCEANEX CONNAIGRA owned/operated by Oceanex Inc. build by FSG in 2013
  • BORE SEA and sister vessel owned/operated by Bore Ltd build by FSG in 2011
  • SEATRUCK PROGRESS and sister vessels owned/operated by Seatruck Ferries One Ltd build by FSG in 2011/2012
  • PAULINE and sister vessels owned/operated by CldN RoRo build by FSG in 2006/2007

Projects & Misc

  • Full battery conversion of AURORA and TYCHO BRAHE  – alternative approval process acc. to IMO MSC.1/circ.1455
  • Workplace risk assessment and safety instruction on Danish national vessels
  • EinsatzGruppenVersorger BONN build by among others FSG in 2013
  • Participated in the International Ship and Offshore Structures Congress technical committee I.2 Loads from 2012-2015
  • Participation in the IMO correspondence group on intact stability

Research Projects

  • Danish research project “Controllable Pre-Swirl Fins” – Blue INNOship
  • German research project on dynamic positioning “DyPos”
  • European research project “Advanced decision support system for ship Design, Operation and Training (ADOPT)”
  • German research project LaSSe “Lasten auf Schiffe im Seegang”